SW106 GTO
Currently under construction at Southern Wind and scheduled for delivery in 2028, the SW106 GTO is a custom project that perfectly embodies the shipyard’s DNA. Born from a highly specific brief, the yacht has been conceived to be fast and competitive on the racecourse, yet remaining safe, enjoyable, and comfortable for long-range family cruising in all conditions.
Realizing such an ambitious vision required a highly integrated approach, bringing together a world-class design team, state-of-the-art simulation tools, and constant collaboration between the shipyard, the owner, and his consulting team.
The naval architecture developed by Matteo Polli, draws on his extensive experience in high-performance racing yachts. His key challenge was to find the “perfect balance” between performance and comfort, and between outright speed and complete control. Supported by Gurit for structural engineering and Plus Solutions for CFD simulations, Polli developed a hull with a wide beam optimized to perform at low heel angles. This approach reduces ballast weight while increasing interior volume and deck space. To maintain efficiency in light winds, the design also features a narrow waterline to minimize wetted surface area.
At higher speeds, an unconventional stern shape reduces wave drag, while the gradual volume distribution at the bow and stern ensures comfort and stability in long ocean swells. The powerful sail plan incorporates a tall rig with a square-top mainsail to maximize performance. By positioning the mast further aft, the design increases the foretriangle, allowing for efficient multiple-headsail configurations. Exceptional helm feel and control are achieved through a single forward positioned rudder, paired with a lifting keel with an optimized airfoil profile for maximum efficiency.



